AC DataCenter

Formwork & shoring

Managing formwork and shoring operations requires a proactive approach to ensure structural integrity and protect your crew from unexpected collapses. By prioritizing rigorous inspection protocols and clear communication, you can maintain a secure environment that keeps your small-scale projects running smoothly and safely.

Key risk diagnosis for this task

About 44% of related real accidents concentrate in these types.

#122%
Other falls
#211%
Cut/Puncture by Object
#311%
Collapse of temporary structures

Key prevention

  • Conduct thorough pre-pour inspections to verify that all components are properly secured and free from structural defects.
  • Ensure that all shoring systems are installed on stable, level surfaces capable of supporting the intended load without shifting.
  • Strictly adhere to the manufacturer’s load capacity guidelines to prevent overloading the formwork assembly.
  • Implement a clear communication plan so that all workers are aware of exclusion zones during concrete placement.
  • Regularly monitor the assembly during and after the pour to identify any signs of movement or instability immediately.

Related accident cases

CollapseMatch 65%

A formwork collapse occurred during the installation and dismantling of formwork shoring, resulting in one fatality and other injuries. Detailed information regarding the cause is insufficient.

Key hazard · Formwork collapse
Prevention · Adherence to safety regulations and enhanced inspections are necessary during formwork shoring installation and dismantling operations.
Match 65%

콘크리트 거푸집 붕괴로 1명이 숨지고 3명이 부상당했다.

Key hazard · 상세정보 부족한 거푸집
Struck-byMatch 64%

During the installation and dismantling of formwork, an employee broke two front teeth after walking around concrete formwork and striking a fan housing panel.

Key hazard · Prefabricated formwork
Prevention · Manage workplace obstacles and ensure clear pathways.
CollapseMatch 64%

During the installation and dismantling of formwork shoring, a concrete formwork collapsed, causing three workers to fall and sustain injuries.

Key hazard · Collapse hazard due to formwork with insufficient details.
Prevention · When installing and dismantling formwork shoring, safety regulations must be followed, and the stability of the formwork must be adequately ensured.
Match 63%

직원은 구체적인 양식을 설정하는 것을 돕고 있었습니다. 그는 이미 설치되어 있는 고정된 거푸집을 밟으려고 하다가 실수로 거푸집에 걸려 넘어졌습니다. 동료가 제자리에 놓으려고 했지만 아직 정지하지 않았으며 EE는 균형을 잃고 얼어붙은 땅에 왼쪽 무릎으로 넘어졌습니다. 시간 낭비도 없고 제한도 없으며 물리 치료를 실시합니다.

Key hazard · 상세정보 부족한 거푸집
CollapseMatch 63%

During work to add decking for concrete pouring, the formwork collapsed due to the failure of its main beam. Two workers fell; one was prevented from hitting the ground by a safety strap, while the second worker struck a wall or fell to the ground.

Key hazard · Formwork collapse due to failure of the main beam
Prevention · Lack of detailed information regarding the work content
FallMatch 63%

While retrieving a piece of plywood from a concrete formwork wall, the worker lost their footing on their personal fall arrest system and fell approximately 9 feet. The incident resulted in head and neck injuries.

Key hazard · Fall from height due to loss of footing on personal fall arrest system during formwork operations.
Prevention · Ensure proper use and secure anchoring of personal fall arrest systems during work.
Structure CollapseMatch 62%

During concrete pouring, an assembled formwork panel failed, causing concrete to spill onto and damage the work deck. This failure was attributed to a 3/4-inch bolt securing the formwork.

Key hazard · Assembled formwork failure
Prevention · Strengthen inspection of formwork bolt strength and installation status.