11
Hazards
7
Unit tasks
9
Related laws
Criminal 3
Full risk assessment
Unit taskHazard / CauseCurrent controlsRisk (F×S)ControlsAfterLegal
Pre-work planning & material inspection
Musculoskeletal strain (lumbar sprain) during material handling
Heavy scaffold tubes or frames manually carried by single worker in awkward posture
Musculoskeletal Disorder
General manual-handling guidance8· Medium
4×2
  • EngineeringProvide trolleys and lifting aids for all scaffold component movement
  • AdministrativeMandate two-person carries for items over 20 kg; provide ergonomic training
4· Medium
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Pre-work planning & material inspection
Worker struck by falling scaffold component during unloading from vehicle
Components not secured during transport; unloading without proper lifting equipment
Struck-by / Impact
Manual unloading9· High
3×3
  • EngineeringUse crane or forklift with load-secure slings for unloading
  • AdministrativeEstablish exclusion zone under load during unloading; never stand under suspended load
3· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Ground preparation & base plate installation
Scaffold collapse due to inadequate base preparation
Ground not levelled; base plates not installed; sill boards absent on soft ground
Fall
Visual inspection of ground6· Medium
3×2
  • EngineeringCompact ground; install sill boards and adjustable base plates before erection begins
  • AdministrativeCompetent person inspects base conditions; document and approve before erection proceeds
2· Low
제141조
조립 등의 작업 시 조치사항
Criminal
Scaffold frame erection
Worker falls during frame erection at height
No adequate fall protection during erection phase before guardrails are installed
Falls from Height
Safety harness requirement6· Medium
3×2
  • EngineeringInstall leading-edge guardrail system or use mobile elevated work platform (MEWP) for erection
  • AdministrativeRequire full-body harness tied to lifeline during all leading-edge work above 1.8 m
  • PPEFull-body harness + shock-absorbing lanyard; hard hat with chin strap
2· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Scaffold frame erection
Tools or components dropped from height strike workers below
Tools not tethered; no exclusion zone established below erection area
Falling Objects
Hard hat requirement10· High
2×5
  • EngineeringInstall debris netting and toe-boards; tether all tools
  • AdministrativeEstablish and enforce exclusion zone below erection area; post signage and barrier
5· Medium
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Guardrail & toe-board installation
Worker falls through unguarded opening before guardrail is installed
Guardrail installation lags behind deck installation
Falls from Height
Harness use8· Medium
4×2
  • EngineeringUse 'advance guardrail' system — install guardrail one level ahead of deck
  • AdministrativeNever leave an unguarded edge unattended; cover all openings immediately
4· Medium
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Scaffold deck (planking) installation
Worker falls through gap between planks or over unguarded edge
Plank spacing too wide; planks not secured against displacement
Falls from Height
Visual spacing check8· Medium
2×4
  • EngineeringUse purpose-made scaffold planks with securing cleats; gap must not exceed 25 mm
  • AdministrativeCompetent person verifies plank coverage and securing before deck is used
3· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Scaffold deck (planking) installation
Scaffold collapses due to overloading of deck
Construction materials or debris stored on scaffold exceeding rated load
Collapse / Cave-in
Load limit placard9· High
3×3
  • AdministrativePost rated load capacity on scaffold; prohibit material storage on scaffold unless designed for it
  • EngineeringEngineer calculates and labels maximum distributed and point loads before scaffold is used
2· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Scaffold dismantling
Worker falls during dismantling — unguarded leading edge
Guardrails removed before workers move to lower level
Falls from Height
Harness requirement6· Medium
3×2
  • AdministrativeDismantle in top-down sequence: remove planks first, then guardrails, then frames — never dismantle out of sequence
  • EngineeringUse MEWP for dismantling outer frames where harness anchorage is unavailable
1· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Scaffold dismantling
Scaffold components dropped or thrown down from height
Components hand-thrown to ground rather than lowered with rope or crane
Falling Objects
Verbal warning to below6· Medium
3×2
  • EngineeringUse rope lowering system or crane to bring down all components; never throw
  • AdministrativeMaintain exclusion zone below dismantling area for entire duration
2· Low
제57조
비계 등의 조립ㆍ해체 및 변경
Criminal
Post-work cleanup & material storage
Worker struck by uncontrolled rolling scaffold tube
Tubes stacked unsecured on uneven ground; no wheel stops
Struck-by / Impact
Stacking guidance6· Medium
3×2
  • EngineeringUse tube racks or chocking blocks to secure stored tubes
  • AdministrativeStore tubes on level, firm surface; use proper binds to prevent rolling
1· Low
제304조
누전차단기에 의한 감전방지
Criminal
Legal compliance (OSH rules)
Art. 55Scaffold Safety Requirements
CriminalMust-check
Art. 56Scaffold Inspection before Use
CriminalMust-check
Art. 57Fall Prevention Measures at Height
CriminalMust-check
Art. 93PPE Provision
Must-check
Art. 44Competent Person Requirement for Scaffold Work
Must-check
Art. 45Work-at-Height Risk Assessment
Must-check
Art. 60Toe-board Requirements
Art. 61Netting and Debris Containment
Art. 62Emergency Rescue Procedures at Height
Grounding real accidents

Worker fell 4 m through an unguarded scaffold opening left when a plank was removed for material hoist access.

⚠ Unguarded opening / plank gap

Scaffold collapsed when a forklift struck a base leg; multiple workers fell along with the structure.

⚠ Vehicle impact on scaffold base

Worker struck by scaffold tube dropped from 6 m during dismantling; suffered fractured skull despite hard hat.

⚠ Falling scaffold component

Scaffold overloaded with bricks and mortar collapsed; two workers fell onto concrete below.

⚠ Scaffold overloading

Worker's harness anchorage point failed because it was clipped to the scaffold guardrail rather than a lifeline.

⚠ Inadequate harness anchorage

Scaffold erected on soft soil subsided overnight; morning shift found structure tilted 15°.

⚠ Inadequate base / ground settlement